<code id="mmjrt"><small id="mmjrt"></small></code>
<div id="mmjrt"></div>
<bdo id="mmjrt"></bdo>
  • <output id="mmjrt"><input id="mmjrt"></input></output>
  • About Us

    Home > About Us > Our Histoty

     

    2017      King had the total output of over 105,595 sets of air conditioning units
    2014      King established a North American Office 
    2010      King established an European office (officially registered as a branch in the following year) in France
    2007      King started to produce air conditionings for 350km/h CRH train
    2006      King expanded production and moved into the current factory, and started to produce air conditioning units for 250km/h CRH train
    2000      King was awarded as Class ¡°A¡± supplier by Alstom, and started to produce subway air conditioning units
    1997      King cooperated with Mitsubishi Electric to produce air conditioning units for high-speed trains
    1995      King started to produce air conditioning units for railway locomotives
    1993      King started to produce air conditioning units for railway coaches


    肉欲AV片精品一区二区,最新久久中字无码,激情婷婷五月,国产第|页草草影院
    <code id="mmjrt"><small id="mmjrt"></small></code>
    <div id="mmjrt"></div>
    <bdo id="mmjrt"></bdo>
  • <output id="mmjrt"><input id="mmjrt"></input></output>